  | 
    The 
        Center building was constructed in 1996. That is a two-story building 
        with a 559 ‡u -total floor space. The staff offices are on the first floor, 
        and the rooms for chemical synthesis, sample preparation and measurements 
        are located on the second floor. 
         
         
         
         
          | 
     | 
     |